This watershed boundary file is created for Poplar Creek through BASINS automatic delineation tool during watershed delineation. NED 1/3 arc second (~ 10 meter resolution) DEM in integer, Z unit in centimeter; downloaded from USGS Seamless data distribution center is also used for watershed delineation. The NED data was downloaded in March 2005. This delineation is completed after resolving the boundary discrepancy and without any modification in DEM.
HSPF (Hydrological Simulation Program--Fortran) modeling for the project: Fox River Watershed Investigation, Stratton Dam to the Illinois River - Phase II
publication date
none
2204 Griffith Dr.
ESRI ArcGIS to process input GIS layers, BASINS 3.1 - Automatic Delineation Tool for watershed and subwatershed delineation, ArcCatalog to complete metadata
Metadata imported.
Internal feature number.
ESRI
Feature geometry.
ESRI
2204 Griffith Dr.